banner

First Day

First day and all aluminium elements are sorted to create framework for alpolic triangles

Preparing the Structure

Working on the aluminium framework for the first tower

Panels on First structure

Panels on First Structure

Aluminium Framework

Drilling holes to attach framework for panels

Attaching Panels

Attaching Panels with Stainless Screws

Support Structure

Our support on their structure"

Inside view

Inside view of Panels fixed to structure

Second Structure

Framework for second structure

Modifying Framework

Framework had to be modified to fit triangle panels

Modifying the frame2

Modification of framework

Ready for Alpolic

Ready for Alpolic

Structure 3 Framework

Structure 3 required an external frame work to be built as a unit

Attach frame to Structure 3

Attaching frame to Structure 3

Done

Done

The Three Graces

The Three Graces